|
|
DAMAGED KERBS COST MONEY! SAVE TIME AND MONEY, USE THE KERBLAY KERBRACE SYSTEM |
An extruded kerb foundation designed so that the road can be constructed before the kerbs are laid. Construct footpaths and lay kerbs just prior to completion and save costs of replacing kerbs damaged during building. The system is purposely designed for house builders and estate roads.
|
| THE ADVANTAGES ARE:- |
 | No kerb damage during construction thus saving replacement costs to satisfy the Local Authority prior to adoption. |
 | Instant Roads - Kerbrace is laid at rates of up to 400m per day. |
 | Services - Service companies will work to lines and levels from the Kerbrace and therefore lay their services prior to kerb and footpath construction. |
 | Fixed Rates - Kerblay quote on a labour, plant and materials basis, no extra over for radius (smallest radius 6m), fixed for one year on all sites throughout the UK. |
 | Cost and Output - Our research has shown that when taking kerb replacement into consideration a 50% saving on kerbing works can be obtained by using the Kerbrace system. If you already use a Kerbrace but form it using road forms, Kerblay is up to seven times faster. |
 | We have various mould shapes to suit kerbs, kerb and channel and block paved applications. |
|
Kerblay Kerbrace has been used throughout the UK (from Aberdeen to Plymouth) since 1985, on sites of all the top ten house builders and it complies with all the relevant British Standards.
If you require further information please contact Derek Chapman on 01273 439203, fax 01273 439205. |
|
|